Interiors

Monday, 8 July 2013

Colour


My home renovation - little noticeable progress


The cornice on one of the corner 
columns in the bedroom has been 
stripped of plaster to reveal the 
stonework and some layers of
paint chipped from the vaulted
ceiling have uncovered an interesting
base colour .



The shelves and lamp-ledge have been
built in the middle bathroom.



On the roof terrace a technical shelter
has been built, to house the bedroom 
air-con motor, and to create storage for 
terrace furniture during the short damp 
winters.
My idea is to cover this with plant pots 
to create a raised garden. This will also 
give my neighbours terrace more privacy,
and something pleasant to look at.



The Leccese stone slabs have been laid
on top of the roof terrace walls. These 
stop the rain from soaking the more porous 
tufo stone that the walls are built with.



The structure of the terrace kitchen has been 
constructed. This will also house the second 
air con motor. The chimney has been reopened
and built a little higher with old tufo bricks that 
we'd save from demolition downstairs.

All the plumbing pipes and central-heating pipes
have been laid. Today the electrician starts work
on the entire electrical circuiting.

Monday, 17 June 2013

My home renovation - lower bathroom, roof terraces and other jobs


The kitchen fireplace is closed and ready 
for cladding



The lower bathroom has been stripped
of all the old tiles and sanitary units. A 
wall below the window houses the flush
cistern and will serve as a shelf above
the w.c. and bidet



The tufo stone is bared and the fireplace
will be walled in on this side, as it now 
faces the kitchen.



The fireplace is now walled in and its 
base juts out into the bathroom to create 
a shower bench. 
The plumbing is ready to be plastered 
over with a resin cement. 



I spent a few hours chipping a hardened layer of
paint and varnished plaster off the tufo stone
which I will now protect and waterproof.
The triangular shaped piece I cut from a
discarded tufo stone so as to close the arch that was
open to the fireplace behind this wall.



The plumbing in the upper bathroom
is done now...but I still haven't found
ceramic tiles that I'm really happy with.



The built-in kitchen is taking shape.




This is the trough on my kitchen terrace below the
kitchen window. Here I'll keep plants and have
running water outside when I need it.



The builders have cut a hole in the bedroom wall
to house the A/C unit. So I'll need to make a screen
(to close it) that allows the air to flow freely.



The bed-loft window has been opened
to it's original size, letting lots more light
stream in.



The top terrace kitchen will be constructed against 
this wall and one of the A/C motors will be fitted here.


The old paving is being relayed on the new roof.



Two rows of tufo stones add height to
the perimeter walls of the top terraces.
That makes me feel a lot safer up there.


Wednesday, 5 June 2013

My home renovation - Kitchen opens up

The bed-loft's wall now separates it from
the kitchen below.

The space for the window and outside
section of the kitchen lets in a lot of light.
The base for the built-in kitchen gets laid.


Views of the openings for the door and window of 
the kitchen now make the terrace almost part of the
 room



Standing below the bed-loft


The external wall of the bed-loft with the fireplace 
and nicchia below

 The lower bathroom stripped of the old
tiles ready for its make-over

The wall that divides the lower bathroom
and the fireplace still needs to be erected
to create the shower area.

The window bench that we created was too high and 
I wanted to be able to use the space underneath it, 
so I've had the top ripped off to lower it which I
will replace with a hinged wooden top so that it
becomes more like a trunk in which I can store
quilts during the long summers.


Thursday, 30 May 2013

The car that runs on air (and some petrol) on sale 2016



The Peugeot-Citroen car that runs on air and petrol 
at 117mpg. Hopefully on sale by 2016.

Read about it here:


My home renovation - Bed-loft, walls going up


Up in the bed-loft. Just a couple more
rows of bricks to go.


The kitchen, with the bed-loft above


Bed loft wall, seen from below on the 
kitchen side


Bed-loft wall, seen on a level from the 
kitchen side


Under and next to the stairs, we're creating 
a utility cupboard to house the washing 
machine and the cleaning equipment.


The view from the bed-loft. This window 
will be opened up to almost four times 
the present size.


Saturday, 25 May 2013

My home renovation - Bed and wardrobe loft


The structure of the staircase is now
complete. It's hard to believe that four
children would climb a ladder to go up
to sleep in this small space above above
what will be my Kitchen/living room.
This will be a spare bed area with a
wardrobe.



A thick concrete balcony base for the
bed and wardrobe loft.